151 Front Street West, Canada’s largest and most important carrier hotel, provides our customers access to over 186 peers and 223 network carriers. 

The building was purpose-built in 1954 to house telegraph equipment and has evolved together with the industry. Since it was first built, it has undergone a number of upgrades in order to better serve tenants in need of ample fiber connectivity, cooling and power.

This facility is well-known for its high levels of security, reliability, and connectivity, and is certified compliant for SOC 1, SOC 2, HIPAA, and PCI-DSS. NetActuate customers in this location can directly peer with the Toronto Internet Exchange (TorIX), in order to gain low latency access to networks throughout Eastern Canada.

 

Building

  • 25,000+ Sq. ft (2,300+ sq. m)
  • 14 in (35 cm) raised floor with 12’ 9” (3.8m) ceiling clearance
  • 8 floors
  • Concrete, steel and brick

Compliance

  • NIST 800-53/FISMA
  • SOC 1 Type II
  • PCI-DSS
  • ISO 27001
  • SOC 2 Type II

Security

  • Key card access
  • Biometric scanning
  • Man traps
  • 24/7 onsite security
  • CCTV monitoring

Connectivity

  • Carrier-agnostic
  • Multiple connections
  • Fiber, copper, coax cross-connects
  • 150+ unique networks
  • Diverse building fiber entrance
  • Direct access to Toronto Internet Exchange (TorIX)

Power

  • 2.4 – 3.0 kVA per cabinet
  • Block redundant UPS configuration
  • N+1 UPS redundancy
  • 7 x 2,000 kW diesel generators
  • N+1 standby power redundancy

    Cooling

    • 3,000 ton capacity
    • N+1 cooler redundancy
    • Hot/cold aisles
    • Chilled water loop connected to building-owned Enwave deep lake water cooling system